The Islamabad Electric Supply Company Limited (IESCO) was established in 1998 to share WAPDA's responsibilities functions, assets, and functions in Islamabad. The Chief Executive Officer of IESCO Amjad Khan is more powerful than the different administrations within PAEC or WAPDA. Since it is a 100% Pakistani firm, IESCO sells, distributes, and distributes electric power through Attock up to Jhelum. It assists 3 million customers directly and eases the lives of more than 25 million residents in its service zones. For online applications to get a brand new IESCO connection in Islamabad you must follow this process exactly as outlined in the following paragraphs.

If it's hard for you to go to an IESCO office in person to request an electricity connection upgrade It is easy to access the online service.


Required Documents for New Connection

  • Name of the person who is applying
  • Permanent Address
  • Postal Address
  • Phone Number
  • Minimum Load
  • Connection type
  • Neighbor details
  • The proof of ownership of your home or commercial property, such as transfer letters or the registry of the location.
  • The applicant must provide evidence that their home or commercial property does not have an electricity connection in place and there aren't any outstanding payments. Any outstanding payments must be paid in the first instance by the person applying.
  • If there are several owners of the properties, each owner has to give their powers of attorney over to the person applying. The applicant has to obtain the power of attorney from every owner.
  • The attested copy of the applicant's CNIC copy
  • If the request is for more than a single phase meter then two ID cards for the witness and two copies of the ID Card are necessary. A duplicate of the tariff should be handed over to the applicant as well as both witnesses. The signature of two witnesses is not necessary if the kind of service is commercial or residential.
  • In the event that the person applying for the loan is an owner of the property owner of the property is required to present a valid NOC.

To Apply for a New Electricity Meter Connection

  1. Click here to go to the official website of IESCO - IESCO's Official Website
  2. Click on "Apply New Connection"
  3. Please fill in the form correctly.
  4. Fill out the online form online.
  5. Print a copy of the application form
  6. Attach all of the documents mentioned above to the form.
  7. Forward it to the appropriate IESCO office.
  8. Once your documents have been checked and your documents verified, you will receive an Order Notice
  9. Make the payment to the bank of your choice
  10. Print a copy of the Demand Notice that you paid
  11. Then, send the original to the appropriate office.
  12. Once the Demand Payment Notification has been verified, a new link will be provided.

New Electricity Connection Charges in Islamabad


1. Single Phase Meter - Fixed Cost

  • Service line length up to and including 40 meters Rs.4000
  • Service line length beyond 40 meters at least 100 meters (with one span of LT that has an Ant Conductor as well as one pole) -- Rs.4000 plus 200 for each meter over 40 meters
  • The length of the service line is beyond 100 meters, up to plus 160m (with two spans of LT and an Ant Conductor, and 2 poles) -- Rs.16000 plus 250 for each meter for distances above 100 meters


2. Three Phase Meter - Fixed Cost

  • The length of the service line up to at least 40 meters Rs.15000
  • The length of the service line is over 40 meters, up to 100m (with one span of LT, with An Conductor, and one pole) (up to 100 meters) Rs.15000 + 250 per meter for the 40 meters
  • The length of the service line is over 100 meters, to 160 meters (with two spans of LT, with the Ant Conductor, and 2 poles) -- Rs.30600 and 300/meter over 100 meters
  • The length of the line of service is greater than 160 meters, and up to and including 280 meters - Rs.48600 + 350 per meter over 160 meters.

 

Post a Comment